We plumb new homes from the slab up, and we lay out every pipe, valve and connection with the next twenty years in mind. You get a system that passes inspection, works on move-in day and stays easy to maintain.

Plumbing that is easy to live with after the build

New construction plumbing covers everything water does in your home: the supply lines that bring it in, the drain and vent piping that carries it out, and the fixtures and water heater in between. We handle it in stages that match your build schedule, starting before the slab is poured and finishing once cabinets and counters are set.

The choices made during framing decide how easy your plumbing is to care for later. A shutoff valve you can reach, a cleanout that is not buried behind drywall, a water heater with room to service it. We plan those details in from the start, because fixing them after the walls close costs far more.

If you are building in Christiana or nearby in Murfreesboro or Smyrna, we work alongside your builder or directly with you as the owner.

What our new construction work includes

Plan review and layout
We go over your plans before any digging starts. We confirm fixture locations, pipe routes and where the water heater will live, and we flag anything that would make future service hard.
Underground rough-in
Before the slab or foundation is finished, we set the drain lines under the floor with the correct slope and leave cleanouts where they can be reached. This work is inspected before it is covered.
Top-out supply and vent piping
Once framing is up, we run the water supply lines and vent piping through the walls. We keep supply lines out of exterior walls where we can, which helps them through a hard winter freeze.
Accessible shutoffs and labeled valves
Every fixture gets its own shutoff, and the main shutoff goes where you can find it in a hurry. We label valves so you or any plumber later knows what each one controls.
Water heater and fixture setting
After finishes are in, we install sinks, toilets, tubs, showers and your water heater. If you want a tankless unit or whole home water filtration, it is easiest and cheapest to plan for it now.
Testing before final inspection
We pressure test the supply system and check every drain before the final inspection, so problems are caught while they are simple to correct.

When it is time to bring in a plumber for your build

  • Your plans are final and the lot is ready

    The plumber should be lined up before the foundation work begins. Underground drain lines go in first, and a late start can hold up the whole schedule.

  • You are building your own home as the owner

    Owner-builders often juggle many trades. We handle the plumbing permit steps and inspections for our part of the job so that piece stays on track.

  • You want room to add features later

    Thinking about a future basement bath, an outdoor kitchen or water filtration? We can stub out lines now so adding them later does not mean opening finished walls.

  • Your builder's plumber fell through

    Schedules slip and subcontractors change. We can step in at the rough-in or top-out stage and pick up where the work stands.

  • You are adding a detached structure

    A guest house or workshop with water needs its own planned supply and drain connections, sized to work with what serves the main house.

How a new construction job runs

  1. 1

    Free estimate and plan walk-through

    Give us a call and we will go over your plans and your timeline. You get a written estimate that breaks out each stage, so you can see where the money goes.

  2. 2

    Permit and underground stage

    We pull the plumbing permit and set the under-slab drains. The inspector checks the work before anything is covered, and we keep the site tidy around the trenches.

  3. 3

    Rough-in after framing

    We run supply and vent lines through the framing and pressure test them. This stage is inspected before insulation and drywall go up.

  4. 4

    Trim-out and final walk-through

    Once finishes are done, we set fixtures and the water heater, test everything and pass final inspection. Then we walk you through your shutoffs and what simple upkeep keeps the system healthy.

Plumber in a cap shines a flashlight on corroded copper pipes and a valve under a kitchen sink as a homeowner kneels beside him at the open cabinet

What shapes the cost of plumbing a new home

Every build is different, so we price from your actual plans rather than a rough guess. Your written estimate lists each stage on its own line, so nothing is lumped together. If spreading the cost out would help your budget, ask us about financing. Cash works too, and so does any major credit card.

Number of bathrooms and fixtures
Each sink, toilet, shower and tub adds piping, venting and labor. A home with three full baths costs more to plumb than one with two, even at the same square footage.
Foundation type
A slab means drain lines are set and inspected before the pour. A crawlspace or basement changes how pipes are routed and how much access we have.
Pipe and fixture choices
PEX, copper and the fixtures you select all affect material cost. We can explain how each option holds up over time so you can weigh price against upkeep.
Water heater and treatment equipment
A tankless water heater or a whole home filtration system needs its own planning for gas, venting, power and space. Including it in the original plan costs less than adding it later.
Site conditions and schedule
Rocky ground, long runs to the street and build delays that require extra trips can all move the price. We point these out up front.

New construction plumbing questions

Something not covered here? (615) 805-6484

When should I call a plumber during my build?

As soon as your plans are close to final and before foundation work begins. The underground drain lines have to go in early, and planning fixture locations ahead avoids costly changes. A call at the planning stage also gives you a clear number to put in your budget.

Do you work with my general contractor?

Yes. We can work as the plumbing subcontractor for your builder or directly with you if you are acting as your own builder. Either way we coordinate around framing, inspections and the other trades.

Who handles the plumbing permit and inspections?

We pull the permit for the plumbing work and schedule the inspections at each stage. We are on site to make sure each stage is ready before the inspector arrives. You do not have to chase that part of the paperwork.

Should I choose PEX or copper for a new home?

Both work well when installed properly. PEX is flexible, uses fewer fittings and handles a freeze better, while copper is rigid and long proven. We will talk through cost and long-term upkeep for your home and let you decide.

Can you plan for things I might add later?

Yes, and it is one of the smartest things you can do during a build. We can stub out lines for a future bathroom, outdoor spigots, a utility sink or water filtration and cap them neatly. Adding them later then takes hours instead of torn-up walls.

Gray tank water heater in a drain pan in a cinder-block garage corner, with new copper lines, a white expansion tank, a tagged brass valve and a utility sink beside it

Start your build with plumbing that lasts

Tell us about your plans and timeline, and we will walk through the layout with you. Your estimate is free, and it covers every stage from underground to final.